Search for collections on Jakarta Global University

ANALISA PENGENDALIAN KUALITAS PRODUK BMPR DENGAN PENDEKATAN SIX SIGMA STUDI KASUS DI PT. IQY

ULYAA, NAADIYATUL ANALISA PENGENDALIAN KUALITAS PRODUK BMPR DENGAN PENDEKATAN SIX SIGMA STUDI KASUS DI PT. IQY. [Skripsi]

[thumbnail of Skripsi - Naadiyatul Ulyaa.pdf] Text
Skripsi - Naadiyatul Ulyaa.pdf

Download (1MB)

Abstract

Increasingly tight business competition demands manufacturing companies to
produce products with good and consistent quality. PT. IQY as an automotive
component manufacturing company still faces quality problems in the BMPR part
painting process, which is characterized by a high number of defective products,
especially butsu defects. This study aims to analyze the quality performance of the
BMPR part painting process, identify the factors causing butsu defects, and evaluate
the effectiveness of quality improvement actions using the Six Sigma method with the
DMAIC (Define, Measure, Analyze, Improve, and Control) approach. The research
method used is the descriptive and applied quantitative method by utilizing
production data and defect data for the period August 2024 to July 2025. Data
analysis was carried out using Minitab software through the calculation of Defects
Per Million Opportunities (DPMO), sigma levels, P-Chart control charts, Pareto
Diagrams, and Cause-Effect Diagrams (Fishbone Diagrams). The results of the study
showed that before the improvement, the DPMO value was 140,815 with a sigma
level of 2.58 and there were still observation points outside the control limits. Based
on the analysis, it was found that the relevant causes of butsu defects came from
human factors and the work environment. Corrective actions were carried out
through operator retraining and routine cleaning of the painting area. After the
implementation of the improvement, the DPMO value decreased to 88,364 with a
sigma level increasing to 2.86. The control chart after the improvement showed that
all observation points were within the control limits, which indicated that the BMPR
part painting process was in a statistically controlled condition. Thus, the application
of the Six Sigma method was proven to be able to reduce the level of butsu defects
and increase the quality stability of the BMPR part painting process.

Keyword: Six Sigma, DMAIC, quality control, butsu defect, BMPR part

Tipe Dokumen: Skripsi
Tipe: Skripsi
Jurusan: Program Studi Teknik Industri
Depositing User: Dept Perpustakaan Jakarta Global University
Date Deposited: 23 Oct 2026 07:49
Last Modified: 23 Oct 2026 07:49
URI: https://digilib.jgu.ac.id/id/eprint/814

Actions (login required)

View Item
View Item