Search for collections on Jakarta Global University

ANALISIS DAN PENGUKURAN KINERJA PEMASOK BERBASIS METRIK MODEL SCOR DAN PERAMALAN STUDI KASUS DI PT USAHA SAUDARA MANDIRI

YULIANTI, RACHMA ANALISIS DAN PENGUKURAN KINERJA PEMASOK BERBASIS METRIK MODEL SCOR DAN PERAMALAN STUDI KASUS DI PT USAHA SAUDARA MANDIRI. [Skripsi]

[thumbnail of RACHMA YULIANTI.pdf] Text
RACHMA YULIANTI.pdf

Download (3MB)

Abstract

This study aims to analyze and measure the supplier performance of PT Usaha
Saudara Mandiri, a make-to-order heater element manufacturer, using metrics
from the Supply Chain Operations Reference (SCOR) model. The research was
motivated by raw material procurement delays and the absence of a structured
supplier performance assessment system. A quantitative method employing the
SCOR approach was used, focusing on the attributes of reliability and
responsiveness—measured via On-Time Delivery (OTD) and Source Cycle Time
(SCT). Historical Purchase Order data from January to June 2025, along with
observations and interviews, were analyzed through benchmarking against
company targets (OTD ≥70%, lead time ≤3 days) and gap analysis. Additionally,
performance for three key suppliers (PT GJ, PT SI, PT SRM) was forecasted for
July 2025 using Simple Moving Average (SMA-3) and Exponential Smoothing
(ETS, α=0.3). Results indicate that OTD values for the three suppliers ranged from
35.29% to 57.14% (averaging ±47%), while Source Cycle Times ranged from 3.5
to 4.0 days; both metrics fell below company targets. PT SI exhibited the largest
gap (OTD gap of -36.71% and a lead time excess of +1 day) and was projected to
pose the highest risk for July 2025. Interviews revealed that delays also stemmed
from internal PO issuance processes that lacked advance planning.
Recommendations were formulated for both parties: suppliers are advised to
increase delivery capacity and establish Service Level Agreements, while the
company is advised to implement an SOP for issuing POs earlier based on
forecasting results. The study's primary contribution lies in its SCOR evaluation
approach—augmented by forecasting for early warning and a dual-perspective
analysis of delay causes—resulting in recommendations that are more practical to
implement than those derived from conventional SCOR approaches.
Keywords: Supplier Performance, Supply Chain, SCOR Model, Reliability,
Responsiveness, Forecasting, Gap Analysis

Tipe Dokumen: Skripsi
Tipe: Skripsi
Jurusan: Program Studi Teknik Industri
Depositing User: Dept Perpustakaan Jakarta Global University
Date Deposited: 23 Oct 2026 07:55
Last Modified: 23 Oct 2026 07:55
URI: https://digilib.jgu.ac.id/id/eprint/816

Actions (login required)

View Item
View Item