FIRDASI NUR AKBAR, FIRDASI NUR AKBAR ANALISIS PERANCANGAN ULANG TATA LETAK GUDANG DAN WORKSHOP PT SWM UNTUK PEBAIKAN ALUR MATERIAL MENGGUNAKAN METODE SYTEMATIC LAYOUT PLANNING (SLP) DAN BLOCPLAN. [Skripsi]
cd peprus versi 2_organized.pdf
Download (1MB)
Abstract
The rapid development of the industrial sector requires companies to
establish warehouse systems and facility layouts that effectively and efficiently
support material flow. PT. Satya Wira Mandiri (SWM) faces layout problems in its
warehouse and workshop, including suboptimal material flow, long material
handling distances, and potential intersecting movement paths, which reduce
material handling efficiency. This study aims to analyze the existing layout, develop
a proposed layout using the Systematic Layout Planning (SLP) and Blocplan
methods, and evaluate its effectiveness based on material handling distance. The
methods include material flow analysis, From-To Chart (FTC), Activity
Relationship Chart (ARC), Activity Relationship Diagram (ARD), space
requirement analysis, and alternative layout development using Blocplan. The
results generated two layout alternatives, namely the S-flow layout and the O-flow
layout. Based on the evaluation, the O-flow layout was selected as the best
alternative with an Adj. Score of 0.97, an R-Score of 0.84, and an R-dist Score of
472. The proposed layout reduced the material handling distance from 1,020 to
412.97, representing a reduction of 607.03 (59.51%), while providing a more
organized material flow and improving the efficiency of warehousing and workshop
activities at PT Satya Wira Mandiri.
Keywords: Facility Layout, Warehouse, Systematic Layout Planning (SLP),
Blocplan, Material Handling
| Tipe Dokumen: | Skripsi |
|---|---|
| Tipe: | Skripsi |
| Jurusan: | Program Studi Teknik Industri |
| Depositing User: | Dept Perpustakaan Jakarta Global University |
| Date Deposited: | 23 Oct 2026 07:18 |
| Last Modified: | 23 Oct 2026 07:18 |
| URI: | https://digilib.jgu.ac.id/id/eprint/808 |
